pldi-workflow
GitHub规划PLDI会议投稿全流程,从11月截止日倒推实验、写作及提交节点,涵盖2月回复窗口、3月通知后的物评与PACMPL制作至6月会议。明确各阶段负责人职责,防范回复期短和物评启动早等风险,并提供拒稿后的转投建议。
Trigger Scenarios
Install
npx skills add brycewang-stanford/Awesome-Journal-Skills --skill pldi-workflow -g -y
SKILL.md
Frontmatter
{
"name": "pldi-workflow",
"description": "Use when planning a PLDI campaign across its annual clock — backward-planning from the November deadline through winter reviewing, the February response window, March notification, post-acceptance artifact evaluation, PACMPL production, and the June conference, with owners for each deliverable."
}
PLDI Workflow
PLDI is an annual, single-deadline venue with a long tail: the paper is due in November, but the project is not finished until the PACMPL article, the badged Zenodo artifact, and the June talk have all shipped. Plan all three from the start. Anchor dates below are the 2026 cycle (deadline Nov 13, 2025; response Feb 17-21, 2026; notification Mar 5, 2026; registration opened Mar 16; conference in Boulder Jun 15-19, 2026) — reread the current dates page before scheduling anything, and note that PLDI 2027's calendar was unpublished as of 2026-07-08 (待核实).
PLDI has no standing editor-in-chief and charges no submission fee; leadership
rotates per edition (2026: General Chair Bor-Yuh Evan Chang, Program Chair Manu
Sridharan), the conference is funded through registration, and the PACMPL
open-access cost is handled through SIGPLAN/ACM Open arrangements at
camera-ready time (pldi-camera-ready), not at submission.
Backward plan from the November deadline
| Weeks out | Milestone for a compiler/analysis paper |
|---|---|
| 12+ | Mechanism frozen; running example chosen; suite + baselines locked (pldi-experiments) |
| 8 | Implementation feature-complete on the suite; measurement protocol scripted (pldi-reproducibility) |
| 6 | Full benchmark campaign run once end-to-end; losing benchmarks diagnosed |
| 4 | Complete draft in acmsmall; proofs or soundness argument internally reviewed |
| 3 | Mock review by a PL colleague outside the project; ablation gaps closed |
| 2 | Final measurement run from clean scripts; claim ledger reconciled (pldi-writing-style) |
| 1 | Anonymity sweep, supplement assembly, HotCRP fields, dual-submission check |
| 0 | Upload with a day of slack |
The long tail after the deadline
Nov: submit; archive exact PDF + scripts + raw results
Dec-Jan: keep the artifact warm — the response window may need a rerun
Feb: response window (days, not weeks): triage -> draft -> co-author pass -> submit
Mar: decision. Accept: start AE packaging same week; camera-ready plan.
Reject: file reviews against the claim ledger; decide POPL/OOPSLA/next PLDI.
Apr-May: artifact evaluation runs; PACMPL production; register; build the talk.
Jun: conference. Post-talk: sync the Zenodo record with the final article.
Two scheduling traps dominate. First, the response window is short and fixed —
a co-author on vacation in late February is a real project risk; put the window
on calendars in November. Second, artifact evaluation begins right after
notification, so the team that celebrates acceptance for two weeks starts AE
already behind (pldi-artifact-evaluation).
Ownership map
Assign one named owner each for: the measurement protocol, the anonymity sweep, the response draft, the artifact, and the camera-ready/rights workflow. The artifact owner should not be the graduating student whose defense is in April.
Rejection routing
A PLDI reject in March leaves useful runway: OOPSLA and ICFP deadlines, or the
next PLDI in November. Route by what the reviews attacked — soundness objections
must be fixed before any resubmission inside the same reviewer community
(pldi-review-process, pldi-topic-selection).
Output format
[Stage] design / implementation / evaluation / writing / submitted / response / decided / post-acceptance
[Next hard date] <from the live dates page; 待核实 if unpublished>
[Critical path] <three tasks gating the next stage>
[Owners] protocol / anonymity / response / artifact / camera-ready
[Long-tail risks] response-window availability, AE start, registration, talk
Version History
- 9f86f09 Current 2026-07-19 17:13