GitHub用于规划ACM SIGCOMM年度项目时间线。涵盖从2月截止日前期的选题、实验锁定、论文提交,到后期的审稿、反驳、修改及相机就绪准备,并兼顾下一届的早期规划,确保符合单年一次截稿的特殊流程。
Trigger Scenarios
Install
npx skills add brycewang-stanford/Awesome-Journal-Skills --skill sigcomm-workflow -g -y
SKILL.md
Frontmatter
{
"name": "sigcomm-workflow",
"description": "Use when planning an ACM SIGCOMM project timeline around the single yearly deadline — venue fit, evidence lock, abstract registration and paper upload in February, the early-reject\/rebuttal\/one-shot-revision review pipeline, shepherd-run camera-ready, TAPS proceedings, artifact evaluation, and forward planning for the next edition."
}
SIGCOMM Workflow
Use this as the project-management skill for a SIGCOMM campaign. The defining constraint is one main-track deadline per year feeding one August conference: there is no fall gate, so the plan is a year-long backward schedule from February, not a two-shot hedge. Replace every date with the current official timetable.
SIGCOMM is a conference, not a journal: it has no standing editor-in-chief and no article-processing charge. The rotating leadership is the per-edition General Chairs and Program Committee Co-Chairs (the 2026 roster was not retrievable on 2026-07-09 — 待核实), and the cost model is registration, not APCs; proceedings publish through ACM TAPS into the ACM Digital Library. Chairs rotate yearly, so re-check the current organization page.
Milestones
- Venue fit and track: confirm a networking-stack mechanism and pick research vs. experience.
- Evidence lock: freeze the testbed, traces, workloads, baselines, measurement methodology, and the tail metrics before writing hardens.
- Abstract registration: real title, authors, topics, conflicts on HotCRP.
- Full-paper upload: anonymous PDF, 12 single-spaced pre-reference pages, ACM template.
- Review release: triage across correctness, novelty, evaluation realism, and clarity.
- Rebuttal: for papers reaching the discussion phase, a concise anonymous reply.
- Decision: accept, one-shot revision, or reject (early or formal).
- Revision (if issued): resubmit ~a month later under a shepherd against the issue list.
- Camera-ready: shepherd sign-off, TAPS final PDF plus source, de-anonymization.
- Artifact evaluation and presentation: AEC badges, public release, August talk.
Backward plan from the February paper deadline
| Weeks out (heuristic) | Systems/measurement milestone |
|---|---|
| 14+ | Mechanism designed; testbed or trace pipeline standing and repeatable |
| 10 | Core evaluation runs producing stable tails across repeated trials |
| 7 | Baselines that fight back implemented and tuned fairly |
| 5 | Full draft in ACM two-column format, figures counting against 12 pages |
| 3 | Internal mock review by a networking-minded reader; break-point experiment added |
| 2 | Reproducibility ledger and artifact skeleton assembled |
| 1 | Anonymity sweep, HotCRP fields, abstract registered |
| 0 | Full paper uploaded AoE; receipt re-read |
These offsets are planning heuristics — anchor each to the current official timetable, never to a previous edition's calendar.
The year has two halves, not one deadline
Because the deadline is annual, the calendar after submission matters as much as before it. As of 2026-07-09 the SIGCOMM 2026 cycle is in its live post-decision phase: the February deadline passed, decisions issued, and the work now is camera-ready finalization, shepherd sign-off, artifact evaluation, and the August presentation — while the next edition's February deadline is already the horizon for new work. Plan both halves: the run-up to the single deadline, and the shepherd-to-proceedings tail that follows acceptance.
Failure modes by stage
- Evidence still moving at week 5 forces last-minute metric changes nobody has re-run — the classic evaluation-realism reject in the making.
- Leaving ACM two-column conversion to the final week surfaces figure-driven overflow late, because figures count against the 12 pages.
- Skipping the mock review forfeits the only chance to hear "your baseline is a straw man" from a friend instead of a reviewer.
- Treating a one-shot revision as optional polish rather than a shepherd-graded contract is how a revision that dodged the issue list gets rejected.
- Deferring the artifact until after acceptance loses the reproducibility evidence that a clean rebuild would have surfaced.
Coordination notes
- Assign one named owner for the reproducibility ledger and another for the anonymity sweep; shared ownership is how both slip.
- Archive the exact submitted PDF and every logged run, since rebuttal and revision replies must quote them precisely.
Output format
[Current stage] idea / evaluation / writing / abstract / submission / rebuttal / revision / accepted
[Next official deadline] <date and source, or unknown>
[Critical path] <three tasks that determine readiness>
[Risk register] <format / anonymity / evaluation realism / reproducibility / shepherd>
[Owner map] <task -> person or role>
Version History
- 9f86f09 Current 2026-07-19 17:35