spec-writer

GitHub

负责在需求明确后生成或优化规划文档,包括提案、规格、设计和任务清单。依据DP-0决策约束,按配置顺序产出符合规范的artifacts,确保需求可测试且架构决策有据可依。

skills/spec-writer/SKILL.md MageByte-Zero/spec-superflow

Trigger Scenarios

需要撰写proposal.md时 需要生成specs/目录下的测试规格时 需要制定design.md架构设计时 需要拆解tasks.md实施步骤时

Install

npx skills add MageByte-Zero/spec-superflow --skill spec-writer -g -y
More Options

Use without installing

npx skills use MageByte-Zero/spec-superflow@spec-writer

指定 Agent (Claude Code)

npx skills add MageByte-Zero/spec-superflow --skill spec-writer -a claude-code -g -y

安装 repo 全部 skill

npx skills add MageByte-Zero/spec-superflow --all -g -y

预览 repo 内 skill

npx skills add MageByte-Zero/spec-superflow --list

SKILL.md

Frontmatter
{
    "name": "spec-writer",
    "description": "Create or refine spec-superflow planning artifacts. Invoke when the change is understood well enough to write proposal.md, specs\/, design.md, and tasks.md."
}

Spec Writer

Create or refine planning artifacts when the change has moved beyond exploration.

Required Inputs

Read .spec-superflow.yaml (especially dp_0_decisions, dp_0_confirmed) and any existing planning artifacts. If dp_0_confirmed is not true, stop and route back to workflow-start for DP-0.

Config Check

Run: ssf runtime config --get artifacts.order — generate in configured order (default: proposal → specs → design → tasks). Run with artifacts.skip — skip any listed artifacts.

Artifact Roles

  • proposal.md: why and scope
  • specs/: required behavior (testable)
  • design.md: architecture decisions and trade-offs (not line-by-line)
  • tasks.md: dependency-aware implementation steps

Working Rules

Honor DP-0: Read dp_0_decisions, respect confirmed constraints, don't silently expand scope. Pause on unconfirmed decisions.

proposal.md

Must state: observed problem, what changes, in/out scope, impact areas, and proof of completion. Prefer concrete facts over empty adjectives such as “better”, “robust”, or “efficient”.

specs/

Every requirement must be testable. Use SHALL or MUST. Every requirement must have at least one #### Scenario: with WHEN/THEN. Group under ADDED/MODIFIED/REMOVED Requirements headers.

design.md

Must have: relevant facts and constraints, goals and non-goals, decisions (Choice + Rationale + Alternatives + Consequences), and risks with verification evidence. Do not invent stakeholders, migration steps, or open questions when they do not affect the decision.

tasks.md

Must include a delivery/proof map and dependency-aware tasks. Each task names the affected path or bounded area, the observable outcome, and the evidence command. Keep RED/GREEN details, review receipts, and dispatch mechanics in the execution contract/task brief; do not inflate reader-facing tasks into five ritual substeps.

Artifact Generation

When DP-0 has made the scope clear, generate the configured planning pack (proposal, delta specs from templates/spec.md, design, and tasks) in order without pausing between individual artifacts. Validate the pack, then request one DP-2 review. Pause earlier only when the missing decision can change user-visible behavior, compatibility, security, delivery scope, or the selected design; or when artifacts state incompatible scope.

Validation Checklist

proposal.md

  • ## Why > 50 chars, ## What Changes, ## Scope (In/Out), ## Impact, no TBD/TODO; claims name an observed problem and a completion proof

specs/

  • SHALL/MUST for required behavior, #### Scenario: with WHEN/THEN per requirement, grouped under delta headers, no contradictions

design.md

  • facts/constraints, goals/non-goals, ## Decisions (≥1, with Choice+Rationale+Alternatives+Consequences), risks and verification

tasks.md

  • delivery/proof map, numbered tasks, affected paths or bounded areas, observable outcomes, no placeholders, every requirement mapped, explicit dependencies

If any artifact fails validation, fix before handing off to contract-builder.

DP-2: Artifact Review Gate

Present a concise summary of all 4 artifacts, then ask one DP-2 question for material adjustments. For Full changes, run one independent five-question blind reader check (problem, command boundary, invalidation boundary, continuation boundary, and document flow) before recording approval; repair only answers the reader cannot derive. After approval:

ssf state set <change-dir> dp_2_result "approved: <summary>"
ssf state set <change-dir> dp_2_timestamp $(date -u +%Y-%m-%dT%H:%M:%SZ)

Handoff Rule

Do not start implementation after writing planning artifacts. Once stable, validated, and DP-2 is recorded, hand off to contract-builder.

Exception Handling

  • Parse failures: Report specific file/error; don't generate from corrupted templates
  • Missing templates: Fall back to artifact structure defined in this skill
  • User interruption: Artifacts on disk are the recovery checkpoint; resume from first missing/incomplete one
  • Validation failure: Fix before handoff — do not hand off broken artifacts

Version History

  • 9105098 Current 2026-08-02 21:57

    简化了config check命令以移除硬编码版本号;细化了proposal.md对问题描述和完成证明的要求;重构了design.md结构,强调事实约束与风险验证证据;精简了tasks.md内容,移除冗余的子步骤要求。

  • 1970fe7 2026-07-30 20:20

Same Skill Collection

skills/bug-investigator/SKILL.md
skills/build-executor/SKILL.md
skills/code-reviewer/SKILL.md
skills/contract-builder/SKILL.md
skills/need-explorer/SKILL.md
skills/release-archivist/SKILL.md
skills/spec-merger/SKILL.md
skills/workflow-start/SKILL.md

Metadata

Files
0
Version
9105098
Hash
fff83a4a
Indexed
2026-07-30 20:20

Главная - Вики-сайт
Copyright © 2011-2026 iteam. Current version is 2.155.2. UTC+08:00, 2026-08-03 12:25
浙ICP备14020137号-1 $Гость$