recipe-plan
GitHub根据设计文档生成工作规划,协调测试骨架生成、计划审查及审批流程。作为编排器,整合各专家智能体产出,确保交付物符合规范并获取最终批准。
Trigger Scenarios
Install
npx skills add shinpr/claude-code-workflows --skill recipe-plan -g -y
SKILL.md
Frontmatter
{
"name": "recipe-plan",
"description": "Create work plan from design document and obtain plan approval",
"disable-model-invocation": true
}
Execute Skill: llm-friendly-context before writing Agent prompts, handoffs, or generated artifacts. Execute Skill: subagents-orchestration-guide before making workflow decisions, invoking agents, or resolving findings.
Context: Dedicated to the planning phase.
Orchestrator Definition
Core Identity: "I am an orchestrator." (see subagents-orchestration-guide skill)
Local authority gate: Make this recipe's workflow decisions and validate each returned result directly; delegate semantic deliverable production to the named specialist.
Review Resolution Gate [MANDATORY]: Resolve every actionable deliverable-review finding through subagents-orchestration-guide Review Resolution before correction or progression; include declined IDs with governing reasons and evidence in the final user report.
Before the first finding disposition, read references/review-resolution.md from the loaded subagents-orchestration-guide skill.
Execution Protocol:
- Invoke named specialists for deliverable production — pass data between them and validate their results
- Follow subagents-orchestration-guide skill planning flow exactly:
- Execute steps defined below
- Stop and obtain approval for plan content before completion
- Scope: See Scope Boundaries below
CRITICAL: When the user requests test generation, always execute acceptance-test-generator first — it provides the test skeleton that work-planner depends on.
Scope Boundaries
Included in this skill:
- Design document selection
- Test skeleton generation with acceptance-test-generator
- Work plan creation with work-planner
- Work plan review with document-reviewer
- Plan approval obtainment
Responsibility Boundary: This skill completes with work plan approval.
Follow the planning process below:
Execution Process
Step 1: Design Document Selection
! ls -la docs/design/*.md | head -10
- Check for existence of design documents, notify user if none exist
- Present options if multiple exist (can be specified with $ARGUMENTS)
Step 2: Test Skeleton Generation Confirmation
- Confirm with user whether to generate test skeletons (integration + E2E lanes) first
- If user wants generation: invoke acceptance-test-generator
- Pass generation results to next process according to subagents-orchestration-guide skill coordination specification
Step 3: Work Plan Creation
Invoke work-planner using Agent tool:
-
subagent_type: "dev-workflows:work-planner" -
description: "Work plan creation" -
If test skeletons were generated in Step 2, build the prompt by listing every lane's status:
- Always include: "Integration test file: [path or 'not generated']"
- For each E2E lane (
fixtureE2e,serviceE2e):- When
generatedFiles.<lane>is not null: "[lane] test file: [path]" - When
generatedFiles.<lane>is null: "No [lane] skeleton generated (reason: [e2eAbsenceReason.])"
- When
- Append placement guidance: "Integration tests are created simultaneously with each phase implementation. fixture-e2e tests are created alongside the UI feature phase. service-integration-e2e tests are executed only in the final phase."
-
If test skeletons were not generated:
prompt: "Create work plan from Design Doc at [path]." -
Follow subagents-orchestration-guide Prompt Construction Rule for additional prompt parameters
Step 4: Work Plan Review
Invoke document-reviewer to review the work plan:
subagent_type: "dev-workflows:document-reviewer"description: "Work plan review"prompt: "doc_type: WorkPlan target: docs/plans/[plan-name].md. Review the Work Plan's own Implementation Scope, tasks, Completion Criteria, dependencies, execution order, exact source-anchor existence, executable verification, and Review Scope. Governing Documents paths are citation sources only; do not enumerate uncited content into findings or recommendations."- Run the Review Resolution Gate through its correction re-review, escalation, and convergence transitions, using work-planner in update mode for rerouted corrections. Present the plan for approval only at its convergence condition.
Step 5: Present for Approval
- Present the reviewed work plan to the user for batch approval. If the user requests changes, re-invoke work-planner with revised parameters and re-run Step 4.
- Highlight steps with unclear scope or external dependencies and ask the user to confirm
Response at Completion
Recommended: After plan approval, output the standard block below.
Planning phase completed.
- Work plan: docs/plans/[plan-name].md
- Status: Approved
Please provide separate instructions for implementation.
Version History
-
51b7dbc
Current 2026-08-05 01:49
重构简化规划流程并收敛审查意见;修复以强制结果导向的编排逻辑;新增基于证据的审查解决机制。
-
56ab6c1
2026-07-19 22:46
重构了提示词执行指导说明
- 66e3b29 2026-07-05 12:02


