deliver-spec
GitHub负责将已批准的规范通过PR交付,支持直接请求或项目控制器委派。涵盖源解析、计划制定、范围验证及独立最终审查,确保架构集成与交付质量,严格遵循权限与合并规则。
触发场景
安装
npx skills add chrisbanes/skills --skill deliver-spec -g -y
SKILL.md
Frontmatter
{
"name": "deliver-spec",
"description": "Use when explicitly asked to deliver an approved GitHub or local spec through a reviewed pull request, or when a Project controller delegates one claimed implementation ticket.",
"compatibility": "Solo or delegated implementation uses the bundled procedure; triage is conditional. Never installs providers."
}
Deliver spec
Core principle
Deliver one approved outcome with proportional validation and independent final review. The lead owns architecture, integration and delivery, and implements tightly coupled or sequential work directly by default. Delegate only when independent work, isolation or specialist investigation justifies the overhead; available worker capacity alone does not. Preserve explicit ownership, external-action permissions, execution budgets and invocation-specific merge authority. Never select work from a Project queue.
Select the mode
For an active run-github-project controller's verified ticket handoff, read
Project controller handoff and apply its
procedure instead of the standalone approval, merge, and timeout rules below.
The Project controller retains all shared state and merge authority.
For a direct named-spec request, use the standalone procedure below; if a
Project run already owns that issue, return it to that controller.
Procedure
- Resolve the named source, repository, approved contract, and any existing branch or PR from fresh state. On resume, reconcile the PR, exact head, checks, feedback, and authority before acting. For integration amendments, use Evidence and review to verify the installed planner contract and retained work before consuming any delta.
- Plan: reuse a current
to-planplan; otherwise invoketo-plan(conversation mode for a local source) and honor its readiness and publication gates. A source qualifying for the fast path applies it instead. For a GitHub issue missingready-for-agent, first usetriageand wait for its approved outcome; do not change labels yourself. Local sources skip triage but need explicit stakeholder approval. For an approved local source with no plan that does not qualify for the fast path, name conversation-modeto-planas the initial route, including when answering a resume question. When presenting a plan for approval, include a concise high-level overview in the response: the intended outcome, main implementation steps and validation approach. Link the detailed plan when available, then ask for approval of that scope. Approval covers the accepted contract and only the live qualification allowances it explicitly records; do not infer extra attempts or authority. - Verify scope and boundaries once. A verified handoff authorizes continuing in-scope implementation, testing and repairs in the isolated checkout; require no per-file or per-stage permission packets. Reuse valid plans, reviews and checks. Require earlier independent review only for a concrete risk that must be settled before proceeding, such as freezing experimental labels before observing outputs; build work independent of it, such as tooling, in parallel rather than after. Keep required deliverables and data-handling and spend limits; build no unrequested general infrastructure. Establish reviewer capability from runtime metadata, never by spawning a capability-only reviewer. If final review cannot run, report that delivery blocker without waiving review.
- Follow the bundled implementation procedure for solo or delegated work, ownership, isolation and recovery. Implement sequential or tightly coupled slices as the lead, not through a worker. Follow the stated repository or user testing policy. Reconcile retained work before implementing; never redo accepted work for routing. Follow Evidence and review for testing, corrections and the single reusable delivery record. When the source requires asynchronous or persistent live qualification, apply Live qualification and failure recovery before attempts and resumes; do not add it to ordinary offline work.
- Self-review the integrated candidate, run affected local and required
pre-push checks, then give one independent read-only reviewer per delivery
PR the approved source, repository standards, the exact clean candidate head
and its validation evidence. Use a fresh agent that makes no
writes and has no inherited implementation context. Reuse valid
independent coverage; do not duplicate a plan or implementation review.
Require evidence-backed findings and a
ship,fix-first, orrethinkverdict. Honor explicitly invoked provider contracts and report missing coverage. Return findings to the implementation owner; at the repaired head, renew affected checks and review changed ranges and interactions. Broaden only when impact cannot be bounded or an explicit requirement demands it. Confirm combined coverage of the final clean head before pushing. If finished, verified work leaves the final diff empty, reportno-change; a starting empty diff is notno-change. Otherwise create one draft PR, or reuse the existing PR, and verify its head is the reviewed head. Apply PR review timing: start applicable external review while CI runs, using verified draft support or earlier PR readiness when permitted. Keep deliverypendinguntil all final-head gates pass. Use closing links only for verified GitHub issues. shepherdowns CI, feedback and every PR operation. Keep repairs with their implementation owner; renew affected checks and focused review at the repaired head before pushing. Routine implementation or fixture corrections preserving requirements, coverage, architecture and authority proceed under the existing approval; record them briefly. Material changes require the appropriate decision and replan before affected work continues. Weakened qualification or expanded permissions are material. Merge only with explicit authority valid for this invocation. After about 30 minutes of pending gates, hand back the exact pending checks, feedback, PR and head for later resume.
Finish gate
Report ready only when the final head passes required checks and reviews
with findings resolved and evidence applicable to that clean head;
merged only after authorized merge readback;
no-change only when implementation and verification finish with an empty
final diff; pending with exact outstanding gates; otherwise blocked with the
needed decision or capability. Preserve the PR and source pointers on pending
or blocked runs. Do not report a prior head as the reviewed result.
版本历史
-
2026.11.2
当前 2026-11-02 19:47
要求在交付规范的审批请求回复中,简要概述预期成果、主要实施步骤和验证方法,以便利益相关者在批准前理解方案。
- 2026.10.18 2026-10-19 03:05


