Create an Implementation Plan
Translate requirements and system designs into a delivery plan under
docs/plans/<initiative>/. The plan and its work-order files are implementation
records. They are not product specifications.
Read docs/specs/guide/plans-and-work-orders.md and
docs/specs/guide/traceability-and-lifecycle.md before you write the plan.
Inputs
Read these sources in full:
- The applicable requirement documents and
REQ-*orAC-*IDs. - The applicable system-design documents.
- Related ADRs.
- The relevant source, tests, and one similar implementation.
Use the legacy feature specification during migration only when no replacement requirement or design exists.
Read each spec's Implementation Plans and related-plan links, then inventory
all existing companion plan directories. Treat linked packages as one
synchronized implementation record: reconcile every affected task scope, E2E
scenario matrix, status, and exact final verification results/counts before
completion.
Outputs
Create:
docs/plans/<initiative>/plan.md
docs/plans/<initiative>/task-<NN>-<short-slug>.md
plan.md is the work-package manifest. Each task-*.md file is one work order.
Workflow
1. Map the change
Run the /interview-me assumption check, reusing settled specification choices.
Resolve material blockers before decomposing the affected work. For large
uncertain initiatives, use that skill's decision-mapping reference first.
Identify:
- The required outcomes and acceptance criteria.
- The design boundaries that implementation must preserve.
- Existing models, repositories, services, handlers, clients, stores, and UI.
- Existing tests and end-to-end patterns.
- The dependency order for implementation.
Use python3 scripts/list-docs.py decisions --text <capability-term> --format paths
to locate relevant decisions. Stop when the requirements, system design, ADRs,
and code disagree on a material boundary.
2. Write plan.md
Use this structure:
---
created: YYYY-MM-DD
status: draft
requirements:
- REQ-<SYSTEM>-<CAPABILITY>-001
system_design:
- ../../specs/<system>/system-design/<capability>.md
legacy_specs: []
---
# Implementation Plan: <Initiative>
## Overview
State the result, the implementation order, and the reason for that order.
## Scope
### In scope
- List the owned outcomes.
### Out of scope
- List explicit exclusions.
## Technical approach
Name exact files, symbols, schema changes, contracts, and integration points.
Organize this section by implementation boundary or vertical slice.
For a shared provider or adapter path, include a compact compatibility matrix
covering the provider, transport, identity or capability shape, intended
behavior, verification evidence, and unsupported-shape fallback. Shared
implementation does not imply that every provider is supported; state
conditional coverage explicitly.
## ASCII UI preview
Required when rendered UI changes. Follow the preview contract in
`docs/specs/guide/plans-and-work-orders.md`: show labelled views, relevant
states, desktop/phone composition, and structural requirements. Omit for
packages without UI changes.
## Tests
Map every relevant acceptance criterion to its unit or integration evidence.
Name the exact test file and method.
## E2E tests
Include this section when the change has user-visible behavior. Map each flow
to the applicable `AC-*` IDs and name the Playwright file and project.
## Work orders
- [ ] [Task 01: <Title>](task-01-<slug>.md)
## Verification results
Pending.
## Risks
- Name concrete delivery or compatibility risks.
## Open questions
Delete this section when it is empty.
Do not place complete work-order bodies in plan.md.
3. Write work orders
Use this structure:
---
id: "01-<slug>"
title: "<Title>"
status: pending
wave: 1
depends_on: []
plan: "plan.md"
requirements:
- REQ-<SYSTEM>-<CAPABILITY>-001
acceptance_criteria:
- AC-<SYSTEM>-<CAPABILITY>-001.1
system_design:
- ../../specs/<system>/system-design/<capability>.md
---
# Task 01: <Title>
## Summary
State the implementation outcome in two or three sentences.
## In scope
- List the responsibilities that this work order owns.
## Out of scope
- List adjacent work that this work order does not own.
## Acceptance
- Give one to three concrete implementation conditions.
## ASCII UI preview
For a UI work order, include its relevant view or excerpt from the plan with
the same view label, a link to the full preview, and applicable AC references.
Omit for work orders without rendered UI changes.
## Verification
```bash
<exact targeted command>
```
## Files likely touched
- `path/to/file`
## Dependencies
Name prior work orders or write `None`.
## Risks
- Name concrete implementation or compatibility risks, or write `None`.
## Parallelism
`sequential`
## Inputs
- Requirement and system-design sections.
- Existing code and test patterns.
## Results
Pending.
Each work order must deliver one independently verifiable outcome in one focused implementation pass. Prefer a narrow end-to-end slice. Split by layer only for a real dependency or verification boundary, not because files occupy different directories. Title wording does not determine task boundaries.
For broad migrations that cannot proceed in vertical slices, sequence compatible expansion, bounded caller migrations, and final removal of the old contract. If a batch cannot pass independently, keep it with its required integration in one work order. Add only dependencies that actually block the outcome. Preserve the exact acceptance IDs, likely files, and verification commands in each work order.
Use parallel-safe only when files are disjoint and the tasks share no schema,
migration, generated contract, lockfile, or package configuration. A wave does
not authorize subagents.
4. Define verification
Every work order needs exact commands. Use repository make targets when they
exist. Frontend work in a fresh worktree includes the workspace dependency
installation before the first package command.
Write each verification block so that a user can run the complete block in one shell. If commands change directories, use one directory change or isolated subshells.
When implementation is complete, replace Pending with every required command
and its result. Include specification and diff gates that run outside the
product test commands.
User-facing behavior needs end-to-end evidence somewhere in the work package. A low-level work order does not need an artificial browser test.
After implementation and targeted checks pass, run every listed verification
command from its documented working directory. In a multi-command block, root
each command independently with (cd <dir> && ...) or an explicit root reset;
never rely on a preceding cd. Confirm each referenced path exists and stays
inside the tool or package scope, and that every changed test suite is covered
before marking Results complete. Record actual results, not planned or stale counts.
Before marking a new plan package complete, run git diff --check -- docs/plans/<initiative> and git status --short -- docs/plans/<initiative>;
the status check catches untracked work orders. Confirm every work order names
existing REQ-*/AC-* IDs and an existing system-design path. Also verify that
every requirement named by a work order is declared by at least one of its
referenced system designs, and that every work-order design is included by the
plan's system-design list. Run the repository's PR-documentation coverage
preflight when one is available; list-docs and specification lint alone do
not prove this cross-reference coverage.
Do not add generic QA, review, simplify, security, or full-verification tasks. Task checks provide pre-PR evidence. Configured PR reviewers provide semantic review after the PR opens.
5. End the design turn
Leave the full design package, including requirements, system designs, ADRs,
plan, and work orders, unstaged and uncommitted so the user can review its diff
in the workspace. Do not stage or commit these files unless the user explicitly
asks. Check git status --short and include the changed paths in the handoff.
Report the requirement IDs, system designs, plan, work orders, dependency order, exact checks, and open risks. For UI changes, also render a compact ASCII preview inline in the final conversation summary; links alone are not enough. Follow the shared preview contract, including phone composition when it differs. Then end the turn.
Do not ask for plan approval or a model switch. The user reviews the artifacts and sends a later explicit implementation request.
Version History
-
359b5ff
Current 2026-09-27 21:36
增强会话和设置指南;新增使用工作区数据预览任务画布的功能。
-
d324d49
2026-09-22 09:45
优化变更映射流程,增加假设检查机制;完善plan.md结构,新增ASCII UI预览要求;引入脚本定位决策文档以增强一致性。
-
0e4ae86
2026-08-27 18:28
新增对系统设计方案、ADRs及相关代码的读取要求;优化了计划文档结构,增加测试映射和风险评估部分。
-
1578843
2026-08-16 08:47
更新描述为主会话工件技能;细化前端状态和测试章节要求;强调依赖映射与垂直切片优先策略。
- b4239d8 2026-07-24 17:32